Downtown Auburn Progress May 2022

On-site work continues on Downtown Auburn's Municipal Complex and infrastructure for the area. Here's the latest from BM&K Construction & Engineering. Regular updates will be provided as the project progresses.

Every step is taken to ensure compliance with the plans and specifications.  This includes but is not limited to:

  • Soil density testing
  • Concrete and materials testing
  • Footing and reinforcing inspections
  • Pavement testing

In addition to the City of Auburn staff and BM&K supervision, Contour Engineering has been on site to inspect utility installation and earthwork conditions, as well as Onsite Monitoring conducting weekly erosion control inspections.

Recently Completed Activities

Site:

  • Install fabric & baskets
  • Fill dirt
  • Grading for Pond A
  • Laid out and installed water vaults
  • Irrigation sleeve installation

Building:

  • CMU installation at evidence room
  • Elevators delivered and stored
  • Steel delivered
City Hall Steel Erection

City Hall Steel Erection

Current Activities

Steel Erection full building

Steel Erection full building

Site:

  • Erosion control
  • Grading for curb
  • Band curb install
  • Sewer work for Harmony development

Building:

  • Procurement
  • Submittals and shop drawings
  • Sally port CMU installation
  • Setting and adjusting steel
  • Metal deck install
Steel Erection full building
Steel Erection full building
Curb Installation

Curb Installation

Upcoming Activities

Site:

  • Curb/gutter
  • Fine grade road/swales

Building:

  • 1st slab on deck pour
  • 2nd floor joist
Full sight

Full sight

For more details about Downtown Auburn's redevelopment activities, subscribe HERE to receive email updates.