On-site work continues on Downtown Auburn's Municipal Complex and infrastructure for the area. Here's the latest from BM&K Construction & Engineering. Regular updates will be provided as the project progresses.

Every step is taken to ensure compliance with the plans and specifications.  This includes but is not limited to:

  • Soil density testing
  • Concrete and materials testing
  • Footing and reinforcing inspections
  • Pavement testing

In addition to the City of Auburn staff and BM&K supervision, Contour Engineering has been on site to inspect utility installation and earthwork conditions, as well as Onsite Monitoring conducting weekly erosion control inspections.

Recently Completed Activities

Site:

  • Gravel placement
  • Gas line relocated

Building:

  • Concrete slab pour
  • Waterproofing
City Hall

City Hall

Current Activities

Concrete Slab on Grain

Concrete Slab on Grain

Site:

  • Waterline Installation
  • Roadway widening along Hwy 29
  • Erosion control

Building:

  • Procurement
  • Submittals and shop drawings
  • Under-slab plumbing
  • Concrete foundation walls
  • CMU installation
Full Site

Full Site

City Hall

City Hall

Upcoming Activities

Site:

  • Final site utilities
  • Pond A

Building:

  • Sallyport foundations and CMU