Downtown Auburn Progress October 2021

On-site work continues on Downtown Auburn's Municipal Complex and infrastructure for the area. Here's the latest from BM&K Construction & Engineering. Regular updates will be provided as the project progresses.

Every step is taken to ensure compliance with the plans and specifications.  This includes but is not limited to:

  • Soil density testing
  • Concrete and materials testing
  • Footing and reinforcing inspections
  • Pavement testing

In addition to the City of Auburn staff and BM&K supervision, Contour Engineering has been on site to inspect utility installation and earthwork conditions, as well as Onsite Monitoring conducting weekly erosion control inspections.

Recently Completed Activities

Site:

  • 100% of piping material on site
  • Pond B

Building:

  • Building Foundations
Atlanta Highway

Atlanta Highway

Current Activities

City Hall Foundation Excavation

Municipal Complex Basement

Site:

  • Waterline Installation
  • Roadway widening along Hwy 29
  • Erosion control

Building:

  • Procurement
  • Submittals and shop drawings
  • Under-slab plumbing
  • Concrete foundation walls
  • CMU installation

Upcoming Activities

Site:

  • Pond A
  • Sewer tie-ins
  • Backfilling foundation walls

Building:

  • 2nd and 3rd basement wall pours
  • Structural steel
  • Waterproofing