Downtown Auburn Progress August 2021

On-site work continues on Downtown Auburn's Municipal Complex and infrastructure for the area. Here's the latest from BM&K Construction & Engineering. Regular updates will be provided as the project progresses.

Every step is taken to ensure compliance with the plans and specifications.  This includes but is not limited to:

  • Soil density testing
  • Concrete and materials testing
  • Footing and reinforcing inspections
  • Pavement testing

In addition to the City of Auburn staff and BM&K supervision, Contour Engineering has been on site to inspect utility installation and earthwork conditions, as well as Onsite Monitoring conducting weekly erosion control inspections.

Recently Completed Activities

Site:

  • Stripping of topsoil
  • Mass grading
  • Pond C
  • Pond B outside wall

Building:

  • Rebar fabrication
  • Cupola shop drawings
  • Building excavation
Pond B Outside Retaining Walls

Pond B Outside Retaining Walls

Current Activities

City Hall Foundation Excavation

City Hall Foundation Excavation

Site:

  • Pond B inside wall
  • Storm drainage – 85% complete
  • Sanitary sewer – 85% complete

Building:

  • Procurement
  • Submittals and shop drawings
  • Foundations

Upcoming Activities

Site:

  • Pond A
  • Water lines
  • Roadways and swales

Building:

  • Foundation walls
  • Concrete masonry units (concrete block)

For more details about Downtown Auburn's redevelopment activities, subscribe HERE to receive email updates.